Skip to product information
5 Pack Mixing Bowls with Lids, Stainless Steel Mixing Salad Bowls, Metal Nesting Bowl, Stackable Salad Serving Bowl for Kitchen Cooking Baking Prepping, Size 4.5, 2.5, 1.5, 1, 0.75QT, Black
$39.99
About This
- 5 Sizes Mixing Bowls: This mixing bowl set includes 5 pack different sizes including 4.5, 2.5, 1.5, 1, and 0.75 quarts to meet all your cooking needs. It is perfect for meal prep, washing vegetables, mixing, marinating, tossing salads, and storing leftovers.
- Premium Material: Each mixing bowl is made of high-quality thickened stainless steel that is rust-resistant, unbreakable, and built to last. They are a durable and practical alternative to glass or wooden bowls, making meal prep and serving more enjoyable.
- Nesting Design: The mixing bowls feature a nested design, with both bowls and lids stacking neatly to maximize cabinet space and keep your kitchen organized.
- Airtight Lids: Each mixing bowl comes with a tight-fitting lid that seals securely to keep food fresh longer in the refrigerator. The lids feature raised handles on both sides for easy opening and closing, making food storage convenient.
- Easy to Clean: These mixing bowls have a smooth surface and rounded edges that resist odors and stains, making them easy to clean. They are dishwasher safe, but please note that the plastic lids should be hand washed.
Overview
- Bowl Material : China
- Number of Pieces : 5
- Brand : COCPOK
- Color : Silver
- Special Feature : Durable, Reusable, Stackable